MBA
Exam
find the remainder when 128^1000 is divided 153 1) 103 2) 52 3) 143 4) 118
Read Solution (Total 0)
MBA Other Question
In a 200m race, A gives B a start of 20m and beats him by 20m. If a beats B by 4sec, Find A's speed. 1) 12.5 2) 7.5 3) 8 4) NOT
At Pizza-Hut pizzas are made only on an automatic pizza-making machine. The machine continually makes different sorts of pizzas by adding different sorts of toppings on a common base. The machine makes the pizzas at the rate of 1 pizza per minute. The various toppings are added to the pizza in the following manner. Starting from every pizza, every fifth pizza is topped with pepperoni, every seventh with olive and baby corn, every eigth with mushroom, and the rest with chesse and tomatoes. The machine works for 13 hours per day without any breaks in between. How many pizzas per day are made with cheese and tomatoes as topping? 1) 418 2) 458 3) 478 4) None of these