CTS Company Numerical Ability Time and Work

8 men can do a piece of work in 12 days while 20 women can do it in 10 days. In how many days 12 men and 15 women complete the same work.
a) 4
b) 5
c) 6
d) 7
e) 8

Read Solution (Total 2)

CTS Other Question

Three taps A,B and C can fill a tank in 20,30and 40 minutes respectively. All the taps are opened simultaneously and after 5 minutes tap A was closed and then after 6 minutes tab B was closed .At the moment a leak developed which can empty the full tank in 60 minutes. What is the total time taken for the completely full?
a) 24 minutes
b) 25 minutes
c) 35 minutes
d) 40 minutes
e) None of these
The difference between the time taken by two cars to travel a distance of 350 km is 2 hours 20 minutes. If the difference between their speeds is 5 km/hr., what is the speed of faster car in km/hr.?
a) 30
b) 35
c) 40
d) 45
e) 50