4 men and 3 women finish a job in 6 days, and 5 men and 7 women can do the same job in 4 days. How long will 1 man and 1 woman take to do the work?

1) 22(2/7) days
2) 25(1/2) days
3) 5(1/7) days
4) 12(7/22) days

Read Solution (Total 2)

MBA Other Question

A diamond expert cuts a huge cubical diamond into 960 identical diamond pieces in minimum number of ‘n’ cuts. If he wants to maximize the number of identical diamond pieces making same number of n cuts to it. What is the maximum number of such diamond pieces?

1) 1000
2) 2000
3) 1331
4) none
There is a work to be done by three friends A,B,C Three of them take 5 hours less than A alone would have taken.one third that B alone would have taken and two ninths of the time C alone would have taken.How long does it take for the three of them to finish the work?

1) 3 hours
2) 4 hours
3) 5 hours
4) none of these