IBM Company Numerical Ability Percentage

P software has coding line 5% more than N, N software has coding line 4/13 more than M. M software has 78 lines of coding. find P lines.

Read Solution (Total 5)

IBM Other Question

In a triangle ABC,point D is on side AB and point E is on side AC,such that BCED is a trapezium.DE:BC =3:5.Calculate the ratio of the area of triangle ADE and the trapezium BCED. 1) A person starts at 2.05PM with 40km/hr and reaches to 8.35 pm. then how much distance he travelled?

2) Company invests $0.33 raw,$4.92 manufacturing, #3.34 adv. if the comapany decided to sell the product $8.61. What is the net profit to get 50000 profit.