IBPS
Government Jobs Exams
Numerical Ability
Time and Work
3 men can do a piece of work in 12 days, 5 women in 8 days and 20 children in 3 days. In how many days can a man, a woman and a child working together complete the piece of work ?
A) 15 days B) 16 days C) 12 days D) 14 days E) None of these
Read Solution (Total 0)
IBPS Other Question
Speeds of Boat A and B in still water are in the ratio of 3:2 Rate of current is 10 Km/hr. Both Boats started from Point P to point Q downstream at the same time. After Boat B reaching Point Q, in return journey, it is powered by engine due to which the speed of the boat in still water is increased by 70%, while returned Boat A returned to Point Q as usual. Both the boats returned back to point P at the same time. Then what is the speed of Boat A?
A) 20 Km/hr B) 30 Km/hr C) 40 Km/hr D) 50 Km/hr E) Cannot be determined
The average weight of A, B, C and D is 40 kg. A new person E is also included in the group, then the average weight of the group is increased by 1 kg. Again a new person F replaces A, then the new average of 5 person becomes 42. The average weight of B, C, D, F is
A) 42.5 B) 41.25 C) 42 D) None of these E) Cannot be determined