A, B and C can complete a piece of work in 10, 12 and 15 days respectively. A left the work 5 days before the work was completed and B left 2 days after A had left. Number of days required to complete the whole work was:
A) 8⅔ B) 9 C) 6 D) 6⅔ days E) 7