IBPS Government Jobs Exams Numerical Ability Time and Work

A, B, and C together can complete a piece of work in 25 days. A and C together can complete 30% of the work in 12 days and B and C together can complete 75% of the work in 33 days. A is 50% more efficient than C. In how many days (approximate integer value) B alone can complete the whole work?
A) 72 days B) 75 days C) 79 days D) 85 days E) 82 days

Read Solution (Total 0)

IBPS Other Question

There are two containers P and Q. P contains 56 kg of salt and Q contains 36 kg of sugar. From P 24 kg of salt is taken out and poured into Q. Then 20 kg of the mixture from Q is taken out and poured into P. Find the ratio of final quantity of salt to sugar in container P.
A) 10/3 B) 20/3 C) 5/3 D) 2/3 E) 40/3
A train X running at the speed of 126 km/hr crosses a man running at 18 km/hr in opposite direction in 12 seconds and crosses a platform A in 20 seconds. Find the time taken by train Y running at 99 km/hr to cross the platform B. The length of the platform B is 70 m more than the length of the platform A and the length of train Y is equal to the length of train X.
A) 24 seconds B) 28 seconds C) 36 seconds D) 32 seconds E) 22 seconds