Accenture Company Numerical Ability Time and Work

Helpers are needed to prepare for the fete. Each helper can make either 4 large cakes or 32 small cakes per hour. The kitchen is available for 3 hours and 20 large cakes and 800 small cakes are needed. How many helpers are required?
A)10 B)12 C)16 D)20 E)24

Read Solution (Total 1)

Accenture Other Question

If f(x) = (x + 2) / (x-2) for all integers except x=2, which of the following has the greatest value?
A)f(-1) B)f(0) C)f(1) D)f(3) E)f(4)
Which of the following will come in place of the Question Mark (?) in the following sequence?
5D7, 7G10, 10K14, 14P19, ?
A)20U24 B)19V25 C)20U26 D)19V24