MBA
Exam
Mr. Munish is a computer programmer. He is assigned with three jobs for which time allotted is in the ratio of 5 : 4 : 2 (jobs are needed to be done individually). But due to some technical snag, 10%, 12.5% and 25% of the time allotted for each job gets wasted respectively. He invests only 50%, 40% and 30% of the hours of what was actually allotted to do the three jobs individually. Find what percentage of the total time allotted is the time wasted by Munish. 1) 38.33% 2) 39.45% 3) 49.09% 4) 58.33% 5) Cannot be determined
Read Solution (Total 0)
MBA Other Question