MBA Exam

one cubic metre piece of copper is melted and recast into a square cross-section bar, 36m long. an exact cube is cut off from this bar.if cubic metre of copper cost Rs 108, then the cost of cube is?

1) 50 paise
2) 75 p
3) 1 Re
4) 1.5 Re

Read Solution (Total 1)

MBA Other Question

There are 10 stations on a railway line. The number of different journey tickets that are required by the
authorities is

1) 90
2) 10
3) 18
4) 89
5) 92
The number of integral values of x for which (5x - 1) < (x + 1)2 < 7x - 3 is

1) 0
2) 1
3) 2
4) 3