A can do work in 36 days, B can do work in 72 days and C can do work in 78 days. the three can take turns in working, i.e. A work on the first day, B work on the second day and C work on the third day and so on. which day will they finish the work?
a.17th
b.19th
c.54th
d.55th

Read Solution (Total 4)

TCS Other Question

Anoop managed to draw 3 circles of equal radii with their centres on the diagonal of a square such that the two extreme circles touches two sides of the square and each middle circles touches two circles on either side.find the ratio of the side of the square to radius of the circles.you may assume square root of 2 is 1.4. The vertices of Δ ABC are point A (7,9), B(3,-7), C(3,-3). Which of the following is true?
a) ABC is a right-angled triangle
b) ABC is an equilateral triangle
c) ABC is an isosceles triangle
d) Both (a) & (c)
e) None of these