self Maths Puzzle


A factory produces nuts and bolts. A machine in it produces only nuts while another produces only bolts. The machine producing only nuts produces 400 nuts per minute and need to be cleared for 15 minutes after production of 2000 nuts. The machine producing only bolts produces 300 bolts per minute and needs to be cleared for 15 minutes after production of 3000 bolts. Find the minimum time required to produce 12000 pairs of bolts and nuts if both machines are operated simultaneously.?

Read Solution (Total 0)

self Other Question


A work is done by 30 workers not all of them have the same capacity to work. Every day exactly 2 workers, do the work with no pair of workers working together twice. Even after all possible pairs have worked once, all the workers together works for two more days to finish the work. Find the number of days in which all the workers together will finish the whole work?
Ramesh has two examinations on Wednesday - Engineering mathematics in the morning and Engineering Drawing in the afternoon. He has a fixed amount of time to read the textbooks of both these subjects on Tuesday. During this time he can read 80 pages of Engineering Mathematics and 100 pages of Engineering drawing. Alternatively, he can also read 50 pages of Engineering Mathematics and 250 pages of Engineering drawing. Assume that the amount of time it takes to read one page of the textbook of either subject is constant. Ramesh is confident about Engineering Drawing and wants to devote full time to reading Engineering Mathematics. The number of Engineering Mathematics text book pages he can read on Tuesday is ?