A factory produces nuts and bolts. A machine in it produces only nuts while another produces only bolts. The machine producing only nuts produces 400 nuts per minute and need to be cleared for 15 minutes after production of 2000 nuts. The machine producing only bolts produces 300 bolts per minute and needs to be cleared for 15 minutes after production of 3000 bolts. Find the minimum time required to produce 12000 pairs of bolts and nuts if both machines are operated simultaneously.?