TCS Company Numerical Ability Time and Work

if A works total in 10 days and B works total in 15 days.if A+B of cost is 5000 then what is the share of B?

Read Solution (Total 9)

TCS Other Question

Ram and Shyam run a race of 2000 m.First,Ram gives shyam a start of 200 m and beats him by 30 s.Next, Ram gives Shyam a start of 3 min and is beaten by 1000 meters.Find time in which Ram and Shyam can run race separatedly. There are 60 slots around a circle, numbered 1 to 60. A man starts from the first slot and jumps to the 5th slot. From there he jumps to the 9th slot and so on. In which slot will he land in his 2200th jump?
(a) 45
(b) 41
(c) 1
(d) 5