R-SAT Exam

Twelve men can complete a work in eight days. Sixteen women can complete the in twelve days. Eight men and eight women started working and worked for six days. How many more men are to be added to complete the remaining work in one day?
option
A. 6 men
B. 24 men
C. 18 men
D. 12 men
E. None of these

Read Solution (Total 7)

R-SAT Other Question

A basket contains 6 red, 4blue, 3green and 2 yellow balls. If two balls are picked at random. What is the probability that either both are green or both are yellow?
option
A. 5/21
B. 101/105
C. 4/105
D. 3/35
E. None Of These
A , B and C rent a pasture. A puts 10 oxen for 7 months, B 12 oxen for 5 months and C 15 oxen for 3 months. If the rent of the pasture be Rs.150, how much C must as his share of rent?
option
A) None
B) 38.57
C) 35.57
D) 36.57