TCS Company

A power unit is there by the bank of a river of 900 meters. A cable is made from power unit to power a plant opposite to that of the river of 2000mts. The cost of the cable below water is Rs. 5/- per meter and cost of cable on the bank is Rs. 4/- per meter. Then find out the amount to be invested to connect those two stations.

Read Solution (Total 6)

TCS Other Question

The size of a program is N. And the memory occupied by the program is given byM = square root of 100N. If the size of the program is increased by 1% then how much more memory is required now? A can copy 50 papers in 10 hours while both A & B can copy 70 papers in 10 hours.

Then how many hours required for B to copy 26 papers?