SSC Government Jobs Exams Numerical Ability Time and Work

A can do piece of work in 10 days and B in 20 days. They begin together but A leaves 2 days before the completion of the work. The whole work be done in

Read Solution (Total 2)

SSC Other Question

If the measures of one side and cone
diagonal of a rhombus are 10 cm and 16 cm
respectively, then its are in cm2 is:
in an examination,the average marks obtained by students whio passed was x%,while the average of thoes who failed was y%.the average marks of student taking the exam was z%.find in terms of x,y,&z the percetage of students taking the exam who failed.