MBA Exam Numerical Ability

the total wages of apiece of work if done by A & B together(in equal proportion) areRs 17300. A can do 80% of this work in 64 days and B can do 70% of the same work in 59.5 days. the wage rate of A is 110% of that of B. A can be employed for a maximum of 70% of the work and b for 60% of the work. the min cost fro getting the work done would be?

Read Solution (Total 1)

MBA Other Question

the contents of a certain box consists of 14 apples and 23 oranges. how many oranges must be removed from the box so that 70% of the pieces of fruit in the box will be apples? equal amounts of water were poured into 2 empty jars of different capacities, which made one jar 1/4 full and the other jar jar 1/3 full. if the water in the jar with lesser capacity is, then poured into the jar with the greater capacity, what fraction of the larger jar will be filled with water?