Accenture Company Numerical Ability Time and Work

A can do a piece of work in 36 days, B in 54 days and C in 72 days. All of them began together but A left 8 days and B left 12 days before the completion of the work. How many days in all did C put in till the entire work was
finished?
A. 48 days B. 24 days C. 12 days D. None

Read Solution (Total 3)

Accenture Other Question

If the diagonal and the area of a rectangle are 25 m and 168 m2, what is the length of the rectangle?
A. 17 m B. 31 m C. 12 m D. 24 m
Two trains, 200 and 160 meters long take a minute to cross each other while traveling in the same direction and take only 10 seconds when they cross in opposite directions. What are the speeds at which the trains are traveling?
A. 21 m/s; 15 m/s
B. 30 m/s; 24 m/s
C. 18 m/s; 27 m/s
D. 15 m/s; 24 m/s