Accenture Company Numerical Ability Time and Work

Helpers are needed to prepare for the fete. Each helper can make either 2 large cakes or 35 small cakes per hour. The kitchen is available for 3 hours and 20 large cakes and 700 small cakes are needed. How many helpers are required?

Read Solution (Total 6)

Accenture Other Question

If f(x) = │(x² – 50)│, what is the value of f(-5)?
a) 75 b) 25 c) 0 d) -25 e) -75
If f(x) = (x + 2) / (x-2) for all integers except x=2, which of the following has the greatest value?
a) f(-1) b) f(0) c) f(1) d) f(3) e) f(4)