There is a leak in the bottom of a cistern. Before the leak it could be filled in 9/2h. It now takes 1/2h longer. If the cistern is full, in how much time would the leakage empty the full cistern?
(a) 45h
(b) 40h
(C) 36h
(d) 56h

Read Solution (Total 2)

Gate Other Question

A cistern has a leak which would empty it in 10h. A tap is turned on which admits 4 L a minute into the cistern and it is now emptied in 15h. How many litres does the cistern hold?
(a) 7400 L
(b) 7200 L
(c) 7100 L
(d) 7500 L
Two coal loading machines each working 12h/day for 8days handle 9000tonnes of coal with an efficiency of 90%, while 3 other coal loading machines at an efficiency of 80% are set to handle 12000tonnes of coal in 6days. Find how many hours per day each should work?
(a) 20h/day
(b) 18h/day
(c) 16h/day
(d) 14h/day