TCS
Company
Numerical Ability
Time and Work
Here 10 programmers, type 10 lines within 10 minutes then 60 lines can type within 60 minutes. How many programmers are needed?
Select one:
a. 16
b. 10
c. 6
d. 60
Read Solution (Total 9)
-
- 10
10 programmer 10 line 10 mins.
10 programmer 20 line 20 mins.
.
.
.
.10 programmer 60 line 60 mins. - 10 years agoHelpfull: Yes(11) No(7)
- 10 PROGRAMMER can type n lines in n MINS so, 10 is the ans
- 10 years agoHelpfull: Yes(8) No(1)
- This question can be solve by chain rule,
answer -10
let the number of programmer needed is x,
then (10*10)/10=(x*60)/60
x=(60*10*10)/10*60
after solving x=10 - 10 years agoHelpfull: Yes(7) No(0)
- 10 programmers
- 10 years agoHelpfull: Yes(3) No(0)
- 10programmer*10min/10 lines=x*60min/60 lines
x=10 programmers
- 10 years agoHelpfull: Yes(2) No(0)
- correct ans is 10
- 10 years agoHelpfull: Yes(0) No(0)
- 10 PROGRARA. 10LINE, 10MINUTE
1 PROGRAMMER 1LINE 1MINUTE.
SO 60 PROGRAMMERS 60 LINES 60 MINUTES
- 10 years agoHelpfull: Yes(0) No(0)
- 10 is the right answer
- 10 years agoHelpfull: Yes(0) No(0)
- The length of the rope in which the horses tied should be equal to half of the side of the square plot so that they just cannot reach one another.
Therefore, the length of the rope is 35m (70/2).
The area covered by each horse should be equal to the area of sector with radius of 70/2 = 35m(length of the rope).
Total area covered by the four horses = 4* area of sector of radius 35 metres = Area of circle of radius 35m.
Area left ungrazed by the horses = Area of square field - Area covered by four horses.
= 702 - (22/7)*35*35 = 4900 - 3850 = 1050 sq.m. - 9 years agoHelpfull: Yes(0) No(0)
TCS Other Question