In a company printing work is done by two machine 5% of the work done by machine A are wasted, and 40% of work done by machine B are wasted. if the 80% of the total work is done by machine A. then what is the total percentage of wastage.
Read Solution (Total 2)
-
- If total 100 units of job is done, then
80 units on machine A and 20 units of machine B.
wasted work by A = .05*80 = 4 units
wasted work by B = .4* 20 = 8 units
total wasted work = 12 units.
so 12% wastage - 13 years agoHelpfull: Yes(20) No(0)
- 5/100(80/100 * 100) + 40/100(20/100 * 100) = 12Ans.
- 12 years agoHelpfull: Yes(2) No(0)