IBM Company Numerical Ability Time and Work

A man can do the work in 20hrs. a machine can reduce the time by 1/8 of the time taken by man. Then what is the time taken by machine to complete the work

Read Solution (Total 2)

IBM Other Question

Which is the biggest among the following 2/8, 0.2, 3/17 A vehicle will start at office at 8.15 it has to reach destination by 9.45. But driver will reach destination 30 mins early then wat is the time taken by driver to reach destination