Infosys Company Numerical Ability Time and Work

One fast typist type some matter in 2hr and another slow typist type the same matter in 3hr. If both do combinely in how much time they will finish.

Read Solution (Total 2)

Infosys Other Question

Sometime after 10.00pm a murder took place. A witness claimed that the clock must have stopped at the time of the shooting. It was later found the position of both the hands were the same but their positions had interchanged. Tell the time of the shooting

a)11.54
b)11.54
c)12.35
d)10.50
A telephone cable is to be run from a junction point on the bank of a river 900 meters wide to an office that is located 3000 meters downstream on the opposite bank. If the cost of laying cable under water is Rs. 5 per meter and that of laying overhead on land is Rs. 4 per meter, find the point downstream where the cable is to cut across the river.
(a) 450
(b) 1800
(c) 2800
(d) 2100
(e) 2700