IBM Company Numerical Ability Time and Work

Four skilled workers do a job in 5 days, and five semi-skilled workers do the same job in 6 days. How many days will it take for two skilled and one semi-skilled worker to do that job?

Read Solution (Total 2)

IBM Other Question

Brittany needs a mixture of 76% oats and 24% corn. She currently has 25 pounds of a mixture that is 28% oats. How many pounds of oats should be added to the mixture? A tyre has punctures. The first puncture alone would have made the tyre flat in 9 minutes and the second alone would have done it in 6 minutes. If air leaks out at a constant rate, how long does it take both the punctures together to make it flat?
A. 1x1/2 minutes B. 3x1/2 minutes
C. 3x3/5 minutes D. 4x1/4 minutes