Wipro Company Numerical Ability Time and Work

Machines X and Y always operate independently and at their respective constant rates. When working alone machine X can fill a production lot in 5 hours, and machine Y can fill the same lot in x hours. When the two machines operate simultaneously to fill the production lot, it takes them 2 hours to complete the job. What is the value of x?
A. 10/3
B. 7/3
C. 3
D. 5/2
E. 3/2

Read Solution (Total 1)

Wipro Other Question

In a certain brick wall, each row of bricks above the bottom row contains one less brick than the row just below it. If there are 5 rows in all and a total of 75 bricks in the wall, how many bricks does the bottom row contain?
A. 14
B. 15
C. 16
D. 17
E. 18
Each edge of a cubical block of wood measures 2 inches. What is the surface area of the block in square inches ?
A. 4
B. 8
C. 12
D. 16
E. 24