CTS Company Numerical Ability Time and Work

It takes 8, 12 and 16 days for A,B and C resp. to complete a task. How many days will it take if A works on the job for 2 days then B works on it until 25% of the job is left for C to do, and C completes the work?

a) 10 days b) 14 days c) 13 days d) 12 days

Read Solution (Total 3)

CTS Other Question

There are 2 toy cars facing each other at a distance of 500 cm from each other. Each car moves forward by 100 cm at a speed of 50 cm/s and then moves backward by 50 cm at a speed of 25 cm/s. How long will it take for the cars to collide?

a) 12s b) 14s c) 16s d) 13s
A and B run in opposite directions from a pt. P on a circle with different but constant speeds. A runs in clockwise direction. They meet for the first time at a distance of 900 m in clockwise direction from P and for the second time at a distance of 800 m in anticlockwise direction from P. If B is yet to complete one round, the circumference of the circle is

a) 1700m b) 1250m c) 1300m d) 1200m