. 8 man work for 6 days to complete a work. How many men are required to complete same work in 1/2 day.
Ans. 96 men.

Read Solution (Total 7)

L&T Other Question

14. 1,40,00,000 pencils are put up straight. all the pencils are of length range 3 to 6 inches. 80% of the pencils have
average of five inches. so the find out the total length spanned by the pencils.
Ans. 1000 to 1500 miles.
Speed of trains A and B are 29 & 56 km/hr travelling in the same direction. Man in slower train passes in 16 min.
Find the length of the train.?
Ans 120m