Fill dirt or fill soil is usually the sub-soil removed from an excavation side and is used to level a place or create
artificial mounds. If the average density of sub—soil removed from a site is 3gm/cu cm and it weight 400 kg.
How many hemispherical pits each of volume 240 cubic cm, can this sub-soil fill?
(a)555 (b)277 (c)556 (d)554
Read Solution (Total 1)
-
- 3gm per cm cube and there are hemispheric pits of capacity 240 cm cube
so..each hemisphere can contain 3*240=720cm cube soil..
so total 0f 400kg i.e. 400*1000=4,00,000gms will be held in
4,00,000/720=555.55 so approx 555 hemispheric pits are required...556 cannot be as 555.55 is less than 556....cheers..:) - 14 years agoHelpfull: Yes(20) No(1)