exam Maths Puzzle Numerical Ability

A concrete driveway measures 14 yards by 5 yards. The driveway will be 0.75 yards thick. (a) How many cubic yards of concrete will be needed? (b) How much will it cost if concrete is $4.75 per cubic yard?

Read Solution (Total 0)

exam Other Question

A,B and C can do a piece of work together in 3 days. A can do it alone in 10 days and B can do it alone in 8 days. How long will it take C to do the job alone? Add and express your answer in simplest form: x/18+3x/18 I came up with 2x/9 What did I do wrong here? Thanks