CAT Exam

In Nuts And Bolts factory, one machine produces only nuts at the rate of 100 nuts per minute and needs to be cleaned for 5 minutes after production of every 1000 nuts.Another machine produces only bolts at the rate of 75 bolts per minute and needs to cleaned for10 minutes after production of every 1500 bolts. If both the machines start
production at the same time, what is the minimum duration required for producing 9000
pairs of nuts and bolts?

Read Solution (Total 2)

CAT Other Question

What is the capacity of the cylindrical tank?

I.

The area of the base is 61,600 sq. cm.

II.

The height of the tank is 1.5 times the radius.

III.

The circumference of base is 880 cm.

A. Only I and II
B. Only II and III
C. Only I and III
D. Any two of the three
E. Only II and either I or III
Three classes A,B & C take the test.The average score of class A,B & C is 83, 76 & 85 respectively. The average score of all students of class A & B together is 79 and the average score of all students of class B & C together is 81. What is the average of all the three classes?