TCS Company

60 men complete work in 40 days.60 men start the work and every five day five people leave.In how many days the work will be completed?

Read Solution (Total 5)

TCS Other Question

5 . A train approaches a tunnel AB. Inside the tunnel is a cat located at a point that is 3/8 of the distance AB measured from the entrance A. When the train whistles the cat runs. If the cat moves to the entrance of the tunnel, A, the train catches the cat exactly at the entrance. If the cat moves to the exit, B, the train catches the cat at exactly the exit. The speed of the train is greater than the speed of the cat by what order?
(3 : 1)

(4 : 1)

(5 :1)

(2:1)

none
Wht should be added in 6440 that is when divided by 460 gives reminder 35.