TCS Company

Sagar is 20% more efficient than Pranesh. If Pranesh can complete a piece of work in 30 days, then in how many days can both Sagar and Pranesh complete the work?
a) (11+5/11) days b) (13+7/11) days
c) (15+5/11)days d) (17+7/11) days

Read Solution (Total 2)

TCS Other Question

Mayank can do 50% more work than Shishu in the same time. Shishu alone can do a piece of work in 30 hours. Shishu starts working and he had already worked for 12 hours when Mayank joins him. How many hours should Shishu and Mayank work together to complete the remaining work?
a) 6 b) 12 c) 4.8 d) 9.6
A and B start simultaneously at one end of a swimming pool whose length is 50 m. The swimming race is a race of 1000 m. If A beats B and meets him 17 times during the course and A’s speed is 5 m/s then the speed of B could be
a) 1 m/s b) 3 m/s
c) 4 m/s d) 6 m/s