IBM
Company
Numerical Ability
Time and Work
two sofftware engineers each programmed 840 lines of code for a paarticular job.The first s/w engineer programmed 20 lines of code per minute.The second can do 11.5 lines of code.How many did the 2nd s/w engnr have left to do ?
Read Solution (Total 2)
-
- for 1st s/w engg.
20 lines -> 1 min
840 lines -> 840/20 = 42 min.
for 2nd engg.
1 min -> 11.5 lines
42 min -> 42 * 11.5 = 483 lines.
840 - 483 = 357 lines are left to do by 2nd engineer.
ans is 357 lines - 9 years agoHelpfull: Yes(75) No(0)
- the first software 1min.....20 lines
2nd software 1min.....11.5lines
840lines first s/w can do in 42min
2nd one 840lines in 73.04min
diff b/w two members is 31.04min
ans is 356.96 lines left
i am right?
- 9 years agoHelpfull: Yes(14) No(3)
IBM Other Question