1.A clerk multiplied a number by ten when it should have been divided by ten.The ans he got was 100.what should the ans have been?
2.If Rs20/- is available to pay for typing a research report & typist A produces 42 pages and typist B produces 28 pages.How much should typist A receive?
3.The average salary of 3 workers is 95 Rs. per week. If one earns Rs.115 and second earns Rs.65 how much is the salary of the 3rd worker.
4. A 16 stored building has 12000 sq.feet on each floor. Company A rents 7 floors and company B rents 4 floors. What is the number of sq.feet of unrented floor space.
5. During a given week A programmer spends 1/4 of his time preparing flow chart, 3/8 of his time coding and the rest of the time in debugging the programs. If he works 48 hours during the week , how many hours did he spend debugging the program.
6. A company installed 36 machines at the beginning of the year. In March they installed 9 additional machines and then disconnected 18 in August. How many were still installed at the end of the year.
7. A man owns 2/3 of the market research beauro business and sells 3/4 of his shares for Rs. 75000. What is the value of Business.
8. If 12 file cabinets require 18 feet of wall space, how many feet of wall space will 30 cabinets require?
9.A computer printer produced 176,400 lines in a given day. If the printer was in operation for seven hours during the day, how many lines did it print per minute?
10. From its total income, A sales company spent Rs.20,000 for advertising, half of the remainder on commissions and had Rs.6000 left. What was its total income?
11. On Monday a banker processed a batch of cheques, on Tuesday she processed three times as many, and on Wednesday she processed 4000 cheques. In the three days, she processed 16000 cheques. How many did she process on Tuesday?
12. The cost of four dozen proof machine ribbons and five dozen accouting machine ribbons was Rs.160/¬. If one dozen accounting machine ribbons cost Rs.20/-, what is the cost of a dozen proof machine ribbons?
14. In a library, there are two racks with 40 books per rack. On a given day, 30 books were issued. What fraction remained in the racks?
15. The average length of three tapes is 6800 feet. None of the tapes is less than 6400 feet. What is the greatest possible length of one of the other tapes?
16. A company rented a machine for Rs.700/ per month. Five years later the treasurer calculated that if thecompany had purchased the machine and paid
Rs.100/ monthly maintenance charge, the company would have saved Rs.2000/-. What was the purchase price of the machine?
17. Two computers each produced 48000 public utility bills in a day. One computer printed bills at the rate of 9600 an hour and the other at the rate of 13. If a clerk can process 80 cheques in half an hour, how many cheques can she process in a seven and one half hour day?
7800 an hour. When the first computer finished its run, how many bills did the other computer still have to print?
18. If a salesman s average is a new order every other week, he will break the office record of the year. However, after 28 weeks, he is six orders behindschedule. In what proportion of the remaining weeks does he have to obtain a new order to break the record? Ans. 3/4
19. On a given day, a bank had 16000 cheques returned by customers. Inspection of the first 800 cheques indicated that 100 of those 800 had errors and were therefore the available immediately for data processing. On this basis, hwo many cheques would be available immediately for data processing on that day?
20. A company figured it needed 37.8 sq.feet of carpot for its reception room. To allow for waste, it decided to order 20% more material than needed. Fractional parts of sq.feet cannot be ordered. At Rs.9/- a sq.feet, how much would the carpet cost?
a. Rs.324 b) Rs.405 c) Rs.410 d) Rs.414 e) Rs.685
21. A tape manufacturer reduces the price of his heavy duty tape from Rs.30/¬ to Rs.28/- a reel and the price of a regular tape from Rs.24/¬ to Rs.23/-a reel. A computing centre normally spends Rs.1440/¬ a month for tapes and 3/4 of this is for heavy duty tapes. How much will they save a month under the new prices?
22. In a team of 12 persons, 1/3 are women and 2/3 are men. To obtain a team with 20% women how many men should be hired?
23. The dimensions of a certain machine are 48″ X 30″ X 52″. If the size of the machine is increased proportionately until the sum of its dimensions equals 156″,what will be the increase in the shortest side?
24. In a certain company, 20% of the men and 40% of the women attended the annual company picnic. If 35%
of all the employees are man, what percent of all the employees went to the picnic?
25. It cost a college Rs.0.70 a copy to produce a Program for the homecoming football game. If Rs.15,000/ was received for advertisements in the program, how many copies at Rs.0.50 a copy must be sold to make a profit of Rs.8000/ ?
Read Solution (Total 95)
-
- 1) Let x be the number
x*10=100 .'. x=10
He multiplied it by 10 instead of dividing it by 10
And so x/10=10/10=1 - 9 years agoHelpfull: Yes(20) No(0)
- Ans fr 2) Typist A no of pages=42
Typist B no of pages=28
Total A+B=42+28=70
A=42/70*20=12
Answer is 12 - 9 years agoHelpfull: Yes(20) No(0)
- Ans for 8) 12 file cabinets requires 18 feet of wall space,
30 cabinets=x
12x=30*18=45
Answer is 45
PS: Don't know whether the above ans is right. Please do check.
- 9 years agoHelpfull: Yes(19) No(0)
- Answer fr 3) Lets take workers as third worker as X
(115+65+X)/3 =95
(180+x) = 285
.'. X=105 - 9 years agoHelpfull: Yes(18) No(1)
- Is any body attending interview on 18th May in banglore
- 9 years agoHelpfull: Yes(17) No(0)
- Ans fr 4)Unrented floor space??
Total company A and B rents the floors = 11
Total unrented floor space= (16-11)*12000 = 60000
.'. the answer is 60000 - 9 years agoHelpfull: Yes(10) No(7)
- 15): The average length of three tapes=6800
a+b+c/3=6800
a+b+c=20400
no tape is less than 6400 and we have to find the largest possibility of one tape,
so, 6400+6400+X = 20400
hence X = 7600 - 9 years agoHelpfull: Yes(10) No(0)
- 5) total time = 48hrs ..... flowchart :1/4* 48 = 124
....coding 3/8 * 48= 18 for debugging : 48-(12+18)== 18 - 9 years agoHelpfull: Yes(9) No(2)
- Ans fr 6) 36+9-18=27
Ans is 27 - 9 years agoHelpfull: Yes(9) No(0)
- Answer for 11) Let batch of cheques on monday = X
On tuesday processed three times= 3X
On wednesday processed= 4000
Total cheques processed in 3 days =16000
X+3X+4000=16000
.'. X=3000
Cheque processed on Tuesday 3X= 3*3000=9000
.'. Ans is 9000 - 9 years agoHelpfull: Yes(9) No(0)
- 16) rent for 5 yr = 700 * 60= 42000....maintain charge for 5 yr 100 *60 = 6000....+2000 savings
cost of machine = 42000-8000=34000 - 9 years agoHelpfull: Yes(9) No(0)
- 10) half of the remaining ...so 6000*2 = 12000+20,000==32,000
- 9 years agoHelpfull: Yes(8) No(6)
- 7) 3/4 of buss. = 75000 so total part = 100000 which is the cost of share 2/3 so total part is 1,50,000
check need - 9 years agoHelpfull: Yes(8) No(0)
- Ans for 14) Total 40*2=80
30 books issued so 80-30=50
Fraction remained in the rack is= 50/80 =5/8
Ans is 5/8 - 9 years agoHelpfull: Yes(7) No(0)
- 9) total minutes :7*60 = 420 .....per minute = 176400/420 = 420
- 9 years agoHelpfull: Yes(6) No(0)
- Ans for 12) (4 dozen proof machine rib be 4x + 5 dozen acct machine rib) =160
one dozen acct machine is 20%
so 5 dozen acct machine =100
4x+100=160
x=60/4=15
.'. Ans is 15 - 9 years agoHelpfull: Yes(6) No(0)
- 23.
48+30+52=130, then 156-130=26
the "proportionately" in the shortest side means 30/130*26=6" - 9 years agoHelpfull: Yes(6) No(0)
- 21 )total cost = 1440...3/4 for heavy duty....3/4*1440=1080 ...1080/30=36...36*2=72
remaining 360...360/24=15 ..15 *1=15 saved amount 72+15= 87 - 9 years agoHelpfull: Yes(5) No(1)
- ALL Questions from indiabix.com ....
1.A clerk multiplied a number by ten when it should have been divided by ten.The ans he got was 100.what should the ans have been?
Ans: 1
2.If Rs20/- is available to pay for typing a research report & typist A produces 42 pages and typist B produces 28 pages.How much should typist A receive?
AnsRs12/-
3.The average salary of 3 workers is 95 Rs. per week. If one earns Rs.115 and second earns Rs.65 how much is the salary of the 3rd worker.
Ans.105.
4.A 16 stored building has 12000 sq.feet on each floor. Company A rents 7 floors and company B rents 4 floors. What is the number of sq.feet of unrented floor space.
Ans. 60000
5. During a given week A programer spends 1/4 of his time preparing flow chart, 3/8 of his time coding and the rest of the time in debugging the programs. If he works 48 hours during the week , how many hours did he spend debugging the program.
Ans. 18.
6. A company installed 36 machines at the beginning of the year. In March they installed 9 additional machines and then disconnected 18 in August. How many were still installed at the end of the year.
Ans. 27
7. A man owns 2/3 of the market research beauro business and sells 3/4 of his shares for Rs. 75000. What is the value of Business.
Ans.150000
8. If 12 file cabinets require 18 feet of wall space, how many feet of wall space will 30 cabinets require?
Ans. 45
9.A computer printer produced 176,400 lines in a given day. If the printer was in operation for seven hours during the day, how many lines did it print per minute?
Ans.420
10. From its total income, A sales company spent Rs.20,000 for advertising, half of the remainder on commissions and had Rs.6000 left. What was its total income?
Ans.32000
11. On Monday a banker processed a batch of cheques, on Tuesday she processed three times as many, and on Wednesday she processed 4000 cheques. In the three days, she processed 16000 cheques. How many did she process on Tuesday?
Ans. 9000
12. The cost of four dozen proof machine ribbons and five dozen accouting machine ribbons was Rs.160/-. If one dozen accounting machine ribbons cost Rs.20/-, what is the cost of a dozen proof machine ribbons?
Ans. Rs.15
13. If a clerk can process 80 cheques in half an hour, how many cheques can she process in a seven and one half hour day?
Ans.1200
14. In a library, there are two racks with 40 books per rack. On a given day, 30 books were issued. What fraction remained in the racks?
Ans.5/8
15. The average length of three tapes is 6800 feet. None of the tapes is less than 6400 feet. What is the greatest possible length of one of the other tapes?
Ans.7600
16. A company rented a machine for Rs.700/- a month. Five years later the treasurer calculated that if the company had purchased the machine and paid Rs.100/- monthly maintenance charge, the company would have saved Rs.2000/-. What was the purchase price of the machine?
Ans. Rs.34000
17. Two computers each produced 48000 public utility bills in a day. One computer printed bills at the rate of 9600 an hour and the other at the rate of 7800 an hour. When the first computer finished its run, how many bills did the other computer still have to print?
Ans. 9000
18. If a salesman s average is a new order every other week, he will break the office record of the year. However, after 28 weeks, he is six orders behindschedule. In what proportion of the remaining weeks does he have to obtain a new order to break the record?
Ans. 3/4
19. On a given day, a bank had 16000 cheques returned by customers. Inspection of the first 800 cheques indicated that 100 of those 800 had errors and were therefore the available immediately for data processing. On this basis, hwo many cheques would be available immediately for data processing on that day?
Ans. 14000
20. A company figured it needed 37.8 sq.feet of carpot for its reception room. To allow for waste, it decided to order 20% more material than needed. Fractional parts of sq.feet cannot be ordered. At Rs.9/- a sq.feet, how much would the carpet cost?
a. Rs.324
b) Rs.405
c) Rs.410
d) Rs.414
e) Rs.685
21. A tape manufacturer reduces the price of his heavy duty tape from Rs.30/- to Rs.28/- a reel and the price of a regular tape from Rs.24/- to Rs.23/- a reel. A computing centre normally spends Rs.1440/- a month for tapes and 3/4 of this is for heavy duty tapes. How much will they save a month under the new prices?
Ans. Rs.87
22. In a team of 12 persons, 1/3 are women and 2/3 are men. To obtain a team with 20% women how many men should be hired?
Ans. 8
23. The dimensions of a certain machine are 48" X 30" X 52". If the size of the machine is increased proportionately until the sum of its dimensions equals 156",what will be the increase in the shortest side?
Ans. 6"
24. In a certain company, 20% of the men and 40% of the women attended the annual company picnic. If 35% of all the employees are man, what percent of all the employees went to the picnic?
Ans. 33%
25. It cost a college Rs.0.70 a copy to produce a Program for the homecoming football game. If Rs.15,000/- was received for advertisements in the program, how many copies at Rs.0.50 a copy must be sold to make a profit of Rs.8000/- ?
Ans. 35000 - 9 years agoHelpfull: Yes(5) No(2)
- 7)3/4=75000
so 1/4=25000
thus share he owns is 2/3 so it cost 10,0000
but business cost is (2/3)*x=10,0000
so business cost is 15,0000 - 9 years agoHelpfull: Yes(4) No(0)
- 13 Ques: If a clerk can process 80 cheques in half an hour . How many cheques can she process in a seven and one half hour day?
80 cheques in 1/2 Hr
For an hour 80*2=160
7hours 160*7=1120
7(1/2) hr= 1120+80=1200
Ans is 1200 - 9 years agoHelpfull: Yes(3) No(1)
- @Priya
13 hours 5 min into min
1hr=60min
13 hours=13*60min=780
So ans 780+5=785min. - 9 years agoHelpfull: Yes(3) No(0)
- different questions asked in madurai ibm drive? any of your friends knows questions asked today pls ask them to share....
- 9 years agoHelpfull: Yes(3) No(0)
- 20) 20 % more = 20/100 * 37.8= 7.5....total sq.feet 37.8+7.5=45.3
fractional not to be include so 45 * 9 == 405 - 9 years agoHelpfull: Yes(2) No(0)
- 17) 9600 bill in 1hr.
so 4800 bill in 48000/9600=5hrs
then 2nd computer in 1hr prints 7800
so in 5hrs prints 7800*5=39000
remaining 48000-39000=9000 - 9 years agoHelpfull: Yes(2) No(0)
- 22)Since there are 12 people in total, that means there’s 4 women and 8 men. There needs to be 20% women, so because we know that 4 is 20% of 20, that means that there has to be a total of 20 people. If you add 8 men to the already existing 12 workers, you’ll have 20. You’ll end up with 4 women which is 20% of 20, and 16 men which is 80% of 20.
ans:8men
- 9 years agoHelpfull: Yes(2) No(0)
- no f weeks in a yr=52
26 orders required for the creation f record..
son after 28 weeks no f order should b 14..
the person z short by 8 orders ..
dat means in the nxt 24 weeks he need to cllct 18(26-8) orders
so proportion f order to remaining weeks z 18/24= 3/4
- 9 years agoHelpfull: Yes(2) No(0)
- 18) there are 52 weeks in one year.
Since he supposed to have a new order for every two weeks, he
needs 52/2 = 26 orders to break the office record.
Now after 28 weeks, he has got only 28/2 -6 = 8 orders.
Hence,he needs 26-8 = 18 new orders in the remaining 24= 52-28 weeks to break the office record.
Compute 18 weeks/24 orders = 3/4 weeks/orders. ans
- 8 years agoHelpfull: Yes(2) No(0)
- i posted three to four question koushik check it they asked in may 4th in chennai
- 9 years agoHelpfull: Yes(1) No(0)
- 19) 14000
100 error for 800
so 2000 error for 16000 - 9 years agoHelpfull: Yes(1) No(0)
- 19. ANS 2OOO
- 9 years agoHelpfull: Yes(1) No(0)
- techie is ths a new question paper whr did u get ths
- 9 years agoHelpfull: Yes(0) No(0)
- @Priya Not new i think. Its a IBM previous questions which i got it from other site as a single file.
- 9 years agoHelpfull: Yes(0) No(0)
- Any one knows answer for the 7th question??
- 9 years agoHelpfull: Yes(0) No(0)
- i posted three to four question they asked in ibm recently i have attend in may 4th so kindly go thrpugh guys
- 9 years agoHelpfull: Yes(0) No(2)
- @Priya Yep, Saw those questions. Thank you. How was the interview??? Are you selected??
- 9 years agoHelpfull: Yes(0) No(0)
- am going to attend GTS IBM is there any number series question ...anyone share the question patten @priya @techie
- 9 years agoHelpfull: Yes(0) No(0)
- I think these questions are asked in 4th may at Malla reddy college,HYd.
- 9 years agoHelpfull: Yes(0) No(0)
- @kousick prasad I'm also going to attend the interview on coming Friday.. So far as i know there is no number series only 18 General Aptitude questions are there.. Btw When is ur interview???
- 9 years agoHelpfull: Yes(0) No(0)
- @priya i plan to atten on 18th may
- 9 years agoHelpfull: Yes(0) No(1)
- @techie on 18th may.... after your interview share your exp..
- 9 years agoHelpfull: Yes(0) No(0)
- @kowsick prasad Sure.!
- 9 years agoHelpfull: Yes(0) No(0)
- 7) 2/3*3/4*75000=37500
Is this right..Can any one suggest me the answer? - 9 years agoHelpfull: Yes(0) No(3)
- for 7) total cost cant be less than share
- 9 years agoHelpfull: Yes(0) No(0)
- me too going to attend on 18th
- 9 years agoHelpfull: Yes(0) No(0)
- do u have any materials like this previous ibm questions for GTS @priya
- 9 years agoHelpfull: Yes(0) No(0)
- @priya You have already attended the interview right?? Is it possible to attend the interview again?? Did u get the call letter from ibm?
- 9 years agoHelpfull: Yes(0) No(0)
- ya i wil change my num and email id i need to get job so
- 9 years agoHelpfull: Yes(0) No(0)
- anyone explain ans for thi
On the average Mr.Jackson has 2 hours to plan for an long hour meeting he talk to his assistant 7 hours to prepare the paper work needed.How much hours should jackson and assistant has t plan for 30 min meeting?
options:a)20.00hr b)10.0hr c)48.0 hr d) 24.0 e)35.00hr
- 9 years agoHelpfull: Yes(0) No(0)
- Ok.. Fyn..
- 9 years agoHelpfull: Yes(0) No(0)
- i only posted mrjackson prob pls solve ths ths question asked in ibm pls help guys
- 9 years agoHelpfull: Yes(0) No(0)
- they simply mention ans as 48 but i cant get how ..
- 9 years agoHelpfull: Yes(0) No(0)
- 15)(6800*3)-(6400*2)=2800
- 9 years agoHelpfull: Yes(0) No(2)
- guys i will attending drive 18 may plz help me
- 9 years agoHelpfull: Yes(0) No(0)
- if any one have previous questions plzz fwd me kowsick@gmail.com
- 9 years agoHelpfull: Yes(0) No(0)
- 2)
Typist A no of pages=42
Typist B no of pages=28
A:B = 42:28 = 3:2
A will receive = 20*3 / (3+2)= 12rs - 9 years agoHelpfull: Yes(0) No(0)
- for GTS process is there number series section r not please cofirm @priyadarshini @techie
- 9 years agoHelpfull: Yes(0) No(0)
- @chandusha No number series, Only 18 General Aptitude questions. My interview is on tomorrow..
- 9 years agoHelpfull: Yes(0) No(0)
- me @raj.......
- 9 years agoHelpfull: Yes(0) No(0)
- no number series only quants guys:-) i have a doubt my friend confusing me
printer prints a page in 4 sec app how long it wil take to print 190 pge respec
1 page=4 sec
30 page =120 sec
190 pagee =12 min 40 sec
how u get 12 min 40 sec pls explain - 9 years agoHelpfull: Yes(0) No(0)
- how to convert 13 hours 5 mins to minutes ans is 785 min pls explian
- 9 years agoHelpfull: Yes(0) No(0)
- @ priya I got the ans as 11.. How did u get 12min 40 sec??
- 9 years agoHelpfull: Yes(0) No(0)
- my friend solved dont know how?u pls explain that prob
- 9 years agoHelpfull: Yes(0) No(0)
- techie your ans r crct or not ?u posted 25 questions na pls tel
- 9 years agoHelpfull: Yes(0) No(0)
- No idea.! None of my frnds attended the interview.
- 9 years agoHelpfull: Yes(0) No(0)
- Priya.. Actually ur friend is right..!
1page=4 sec
190*4= 760sec
760 can be splitted as 720sec n 40 sec
we know 12min=720 sec
So Ans is 12min 40sec - 9 years agoHelpfull: Yes(0) No(0)
- I had posted ans for 9 ques only.. Did all 25 didn't get time to post. Hopefully i think its right. Anyways you people try it and if there is mistake, do post the correct answer.. @priya
- 9 years agoHelpfull: Yes(0) No(0)
- 13hrs 5mins that is 13*60=780mins (1hr=60mins)
and there is 5mins
that we have add to 780
so ans is 780+5=785 - 9 years agoHelpfull: Yes(0) No(0)
- techie pls post all answers pls
- 9 years agoHelpfull: Yes(0) No(0)
- @priya Will post it by tomorrow. Right now preparing fr tomorrows interview...
- 9 years agoHelpfull: Yes(0) No(0)
- ok all the best techie
- 9 years agoHelpfull: Yes(0) No(0)
- Thanks priya.!
- 9 years agoHelpfull: Yes(0) No(0)
- Anyone knows solution for this Ques?? :-/
On the average Mr.Jackson has 2 hours to plan for an long hour meeting he talk to his assistant 7 hours to prepare the paper work needed.How much hours should jackson and assistant has t plan for 30 min meeting?
options:a)20.00hr b)10.0hr c)48.0 hr d) 24.0 e)35.00hr
- 9 years agoHelpfull: Yes(0) No(0)
- is any reasoning apps in that 18 question ???
- 9 years agoHelpfull: Yes(0) No(0)
- 4) fr 1 floor==12000/16=750sq feet
rented floors=7+4=11
unrented floors=16-11=5
so unrented 5 floors=5*750=3750sq feet - 9 years agoHelpfull: Yes(0) No(1)
- techie 13 th question is not there and pls post remaining answers
- 9 years agoHelpfull: Yes(0) No(0)
- any1 attended madhurai drive??
plz post d latest questions....that ll surely help banglore candidates - 9 years agoHelpfull: Yes(0) No(0)
- @techie pplz share your interview exp..
- 9 years agoHelpfull: Yes(0) No(0)
- @priyadarshini @techie hw u guys applied to IBM in hyderabad?? pls let me knw since i really want to attend the drive
- 9 years agoHelpfull: Yes(0) No(0)
- Hey guys!!! these 18 questions was asked in IBM GTS or not!!! Please Clarify !@
- 9 years agoHelpfull: Yes(0) No(0)
- employee A woks fom 0100 to 0845 (24 h clock) on each 5 days this week.Next week he is scheduled to work the same total hours but will work a compressed 4 day wok schedule.If he starts work at 0100 next week what time will he finish each day?
- 9 years agoHelpfull: Yes(0) No(0)
- Guys m not selected for the position. Please prepare all previous questions from this site. Mostly all are repeated or only the given data will the changed... The pattern are same. I couldn't make it. My bad luck! If you are selected in the first round most probably there is 95% chance to get a job. @priya @kowsick
- 9 years agoHelpfull: Yes(0) No(0)
- @priya 13th question I already posted in the comment.. Please check it...
- 9 years agoHelpfull: Yes(0) No(0)
- @Bhargavi I attended the interview at kerala. I had applied in the IBM's careers site earlier and got a mail from IBM to attend the interview at anyone of the locations mentioned in the call letter.
- 9 years agoHelpfull: Yes(0) No(0)
- Souray Saha Yes, There are only 18 general aptitude questions. No number series questions.
- 9 years agoHelpfull: Yes(0) No(0)
- @Manjunath Go through all the previous placement questions posted in this site, that will be enough to clear the aptitude round.
- 9 years agoHelpfull: Yes(0) No(0)
- Techie pls share youribm question which u wrote yest
- 9 years agoHelpfull: Yes(0) No(0)
- 1.100
2.840
3.128
4.600000
5.18 hours
6.25
7.1lakh
8.45 feet
9.420 lines/min
10.32000
11.9000
12.15
13.not avaible ;)
14.3/8
15.6800
16.34000
19.200
22.8 - 9 years agoHelpfull: Yes(0) No(1)
- 5. 18 hr
- 9 years agoHelpfull: Yes(0) No(0)
- 19) error cheques is 100/800=1/8
available cheques 1-1/8=7/8
7/8*16000=14000 - 9 years agoHelpfull: Yes(0) No(0)
- any one got repeated questions in aptitude
- 9 years agoHelpfull: Yes(0) No(0)
- 1st answer
clerk multiplied number is 100
so 100*10=1000
so divided we get 1000/10=100
- 9 years agoHelpfull: Yes(0) No(0)
- X*10 and x/10
answer he got was 100.
x*10=100==>x=10
division 10/10=1
answer should be 1. - 9 years agoHelpfull: Yes(0) No(0)
- 19) A bank had 16000 cheques,
In 1st Inspection: out of 800 cheques 100 cheques had errors and 700 cheques were processed b/c 100 had errors.
here 16000(cheques)=800*20(20 times this process is repeated)
so Total errrored cheques =2000( b/c 20 *100)
total 16000-2000=14000
alerady in 1st inspection 800 are completed so remaining are 14000-700=13300(cheques to be inspected)
So ANSWER might be 13300 .
- 9 years agoHelpfull: Yes(0) No(0)
- Q10) let total income be x;
remaining amount=x-20000
1/2(x-20000)=6000
x=32000 - 8 years agoHelpfull: Yes(0) No(0)