GMAT Exam Numerical Ability Time and Work

A and B can complete work together in 5 days. If A works at twice his speed and B at half of his speed, this work can be finished in 4 days. How many days would it take for A alone to complete the job?

Read Solution (Total 2)

GMAT Other Question

Bottle A is 40% filled with water and Bottle B is 30% filled with water, Another Bottle C can be completely filled by pouring either 10% of the content of bottle A or 20% of the content of bottle B. What is the ratio of the capacity of bottle A to bottle B?