TCS Company Numerical Ability Percentage

The productivity of a team of engineers is given by the function
P(N) = 4000 √N, where N is the total strength. Find the percentage change in productivity if the strength of the team is increased by 1%.
(a) 0.75% (b) 0.5% (c) 0.25% (d) 1% (e) 2%

Read Solution (Total 1)

TCS Other Question

FIND THE MISSING NO. IN SERIES ? 3 8 15 ? 61 124 Q30. An aircraft takes off from A (89o N Lat, 40o E Long) at 2.00 AM local time to B (32o N Lat, 40o W Long). If the flying time is 11 hours what is the local time of landing at B?
(a) 6.40 AM (b) 4.00 AM (c) 7.40 AM (d) 7.00AM (e) 8.00AM