According gto a plan, a drilling team had to drill to a depth of 270 meters below the ground level. For the first three days the team drilled as per the plan. HOw ever, susequently finding that their resources were getting underutilised according to the plan, it started to drill 8 metres more than the plan every day. Therefore , a day before the planned date they had drilled to a depth of 280 metres. How many metres of drilling was the plan for each day.
A)38 meters
B)30 meters
C)27 meters
D)None of these

Read Solution (Total 2)

Others Other Question

Two forest officials in their respective divisions were involved in the harvesting of Tendu leaves. One division had an average output of 21 tons from a hectare and the other division which had 12 hectares of land less, dedicated to tendu leaves , get 25 tons of tendu from a ehctare. As a result, the second division harvested 300 tons of tendu leaves more than the first. How many tons of tendu leaves did the first division harvest?
A)3150
B)3450
C)3500
D)NOne of these
If there are two kinds of hats -red and blue - and atleast 5 of each kind , hen in how many ways can the hats be put in each of 5 differant boxes.