3i-Infotech Company Numerical Ability Time and Work

A company contracts to paint 3 houses. Mr.Brown can paint a house in 6 days while Mr.Black would take 8 days and Mr.Blue 12 days. After 8 days Mr.Brown goes on vacation and Mr. Black begins to work for a period of 6 days. How many days will it take Mr.Blue to complete the contract?

A. 7 B. 8 C. 11 D. 12

Read Solution (Total 3)

3i-Infotech Other Question

M men agree to purchase a gift for Rs. D. If three men drop out how much more will each have to contribute towards the purchase of the gift/

A. D/(M-3) B. MD/3 C. M/(D-3) D. 3D/(M2-3M)
2 hours after a freight train leaves Delhi a passenger train leaves the same station travelling in the same direction at an average speed of 16 km/hr. After travelling 4 hrs the passenger train overtakes the freight train. The average speed of the freight train was?

A. 30 B. 40 C.58 D. 60