A work is done by 30 workers not all of them have the same capacity to work. Every day exactly 2 workers, do the work with no pair of workers working together twice. Even after all possible pairs have worked once, all the workers together works for two more days to finish the work. Find the number of days in which all the workers together will finish the whole work?

Read Solution (Total 0)

self Other Question


Three professors Dr. Gupta, Dr. Sharma, Dr. Singh are evaluating answer script of a subject. Dr. Gupta is 40% more efficient than Dr. Sharma, who is 20% more efficient than Dr. Singh. Dr. Gupta takes 10 days less than Dr. Sharma to complete the evaluation work. Dr. Gupta starts the evaluation work and works for 10 days and then Dr. Sharma takes over. Dr. Sharma evaluates for next 15 days and then stops. In how many days, Dr. Singh can complete the remaining evaluation work?

A factory produces nuts and bolts. A machine in it produces only nuts while another produces only bolts. The machine producing only nuts produces 400 nuts per minute and need to be cleared for 15 minutes after production of 2000 nuts. The machine producing only bolts produces 300 bolts per minute and needs to be cleared for 15 minutes after production of 3000 bolts. Find the minimum time required to produce 12000 pairs of bolts and nuts if both machines are operated simultaneously.?