IBM Company Numerical Ability Time and Work

If one man do a job of two boys. If 12 men’s and 15 boys can do a work in 25 days working 7.5 hrs a day. How many boys are required along with 21 men’s to complete a work twice the first one in 50 days.

Read Solution (Total 5)

IBM Other Question

If 200m and 150m long trains moving in the same direction at a speed of 40kmph and 45kmph, what is the time taken by the trains to cross each other. Speed of boat in still water 10 kmph. If the boat takes 24hr in up stream and 16hr in down stream to cross the same distance, then what will be the distance covered.