A can do a job in 16 days. B can do in 24 days. A, B, C can do in 8 days. C alone take?
Read Solution (Total 5)
-
- ans=48 days
sorry my prev ans is wrong actually all the method is right but at the time of calculation some mistakes are there so after solving the eqn 1/c=(1/8)-(1/16)-(1/24) it become 1/48.
so the ans is 48 days. - 11 years agoHelpfull: Yes(12) No(1)
- 48 is ans
- 11 years agoHelpfull: Yes(1) No(0)
- Ans is 48 days
1/8-1/24-1/16=1/c
1/48=1/c - 11 years agoHelpfull: Yes(1) No(0)
- ans=24 days
A ca do the job in 16 days so A can do the work in one day=1/16,
and b=1/24,
and (1/A)+(1/B)+(1/C)=1/8,
so, 1/c=(1/8)-(1/16)-(1/24)
1/c=1/24
so C alone can do the work in 24 days - 11 years agoHelpfull: Yes(0) No(8)
- 1/c=(1/8)-(1/16)-(1/24) => 1/48.
- 11 years agoHelpfull: Yes(0) No(0)