TCS Company Numerical Ability Time and Work

A and B finished a piece of work in 5 days. If A had worked at twice the speed and B at half the speed, they would have finished the work in four days. How many days would it have taken A to finish the work alone?

Read Solution (Total 9)

TCS Other Question

A vender sells two articles at same price with one article at 25% profit and other at 20% loss, what is the profit/loss percent in the overall transaction.
option
a) 5% profit
b) 4.6% loss
c) 4.6% profit
d) 5% loss
B takes 3 steps forward and 1 step backward while walking. He walks up a stationary escalator in 118 seconds. If it takes a total of 40 sec to reach the top when the escalator is moving, then find the speed of the escalator approximately.