Elitmus Exam Numerical Ability Time and Work

Three men can do as much work as 5 boys and the wages of 3 boys are equal to those of 2 men. A work on which 40 boys and 15 men are employed takes 8 weeks and costs Rs 15750. How long would it take if 20 boys and 20 men were employed , and how much would it costs?

Read Solution (Total 13)

Elitmus Other Question

A,B and C can do a piece of work in 12,18, and 24 days respectively. they work at it together . A stops the work after 4 days and B is called off 2 days before the work is done.In what time was the work finished? In what time would a cistern be filled by three pipes whose diameter are 1 cm , 4/3cm, 2 cm running together.. when the largest alone will fill it in 61 minutes; the amount of water flowing in by each pipe being proportional to the square of its diameter?