TCS Company Numerical Ability Probability

60. 48, 38, 28, 24, 20, 18 what is the wrong number in the sequence?

Read Solution (Total 8)

TCS Other Question

33. 17 x 8 m rectangular ground is surrounded by 1.5 m width path. Depth of the path is 12 cm. Gravel is filled and find the quantity of gravel required.
a. 5.5
b. 7.5
c. 6.05
d. 10.08
The savings of an employee equals income-expenditure. If the income of A, B, C is in the ratio 122:3, expenses 322:1. What is the order of employees A, B. C in the increasing order of the size of their savings?
a. a>c>b
b. b>a>c
c. b>c>a
d. c>b>a