CTS Company

A man was given certain number of machines, through which he was able to complete a job in 3 days. If three more machines were given to the man, then he could complete the job in 2 days. If all the machines work on the same rate, then 1 machine will take how many days to complete a work?

Read Solution (Total 1)

CTS Other Question

A person was doing a 4 semester course in which his average was 75. He was doing another 5 semester course. What should be his average in this course so that the average of the entire study is 80%? If 5 tomatoes costs 3 oranges and 5 oranges costs 6 potatoes and 2potatoes costs 4 apples and 7 apples costs Rs.203 then what is the cost of a tomato?