C with his 200% efficiency, can complete 25% of certain work in 12 days. B is 20% more efficient than C. A with 75% efficiency can complete the work in same days as B. If A and B together finish the same work and A gets Rs 10400, then what is the share of B ?
With 200% efficiency C can complete 25% work in 12 days.
⇒ C with 100% efficiency can complete the work in 96 days.
B is 20% more eficient than C, so B can complete the work in 96*(100/120)=80 days.
A with 75% efficiency can complete the work in same days as B ⇒ (100/75)*A=80
.'. A can complete the work in 60 days.
Ratio of efficiencies of A and B = 1/60 : 1/80 = 4 : 3
B's share = (3/4)*10400 = 7800
Correct Option 5)
If I were again beginning my studies, I would follow the advice of Plato and start with mathematics.
Galileo Galilei
mathematics never dies because it always stays in the minds and souls of people who love mathematics.
Those people will not let maths die instead they will die.................