A contractor took a job for his group to do in 20 days. But 12 men did not come up for the job and job was done by remaining man in 32 days. The original number of man in contractor’s team were?
Reason -
Let there be x men originally.
X men do the job in 20 days
X-12 men can do the job in 20x/(x-12) days.
Therefore 20x/(x-12) = 32
=> x = 32
Option 4)