12 labours construct 120 toys in 8 days working 8 hours per day. If two of them leave the work,
then how many days are required to do the same work with a working of 6 hours per day.
A can do a piece of work in 12 days. B is 60 % more efficient to do the same work.
If both of them work together then the number of days required to do the same work is
B is 60 % more efficient, therefore total number of days required by him to do the complete work can be
obtained by the formula
12 *1 = 1.6 * x
=> x = 12 / 1.6 = 7.5
When both of them work together, the work of 1 day is (1/12) + (1/7.5) = 13/60
Hence total number of days required are 60/13
A shopkeeper buys a pen set of 10 pens in 95 rupees and sell them at a rate of 10 rupee per pen.
If every set contains an additional pen of same quality then percentage profit obtained by the shopkeeper is?
On increasing the temperature by 30 degree centigrade, rate of a chemical reaction
becomes 15.625 times the initial rate. If every 10 degree centigrade increment in temperature makes
the similar multiple change (x), then x is equal to
30 degree centigrade means three laps of 10 degree centigrade
According to the given condition
(initial rate) . x . x . x = 15.625 (initial rate)
Or x3 = 15.625
Or x = 2.5