Two ships are sailing in the sea on the two sides of a lighthouse. The angle of elevation of the top of the lighthouse is observed from the ships are 45° and 60° respectively. If the lighthouse is 222 m high, the distance between the two ships is:
OPtion
1) 350.17 m
2) 352.17 m
3) 353.17 m
4) 354.17 m
5) 355.17 m
6) 356.17 m
7) 357.17 m
8) 358.17 m
9) 359.17 m
10)None of these
Solution
Let AB be the lighthouse where A is the bottom point of light house and C and D be the positions of the ships.
Then, AB = 222 m, Angle ACB = 45° and angle ADB = 60°.
AB/AC = tan 45° = 1
=> AC = AB = 222
AB/AD = tan 60° = 3^(1/2)
=> AD = AB/3^(1/2) = 74*3^(1/2)
"A father said to his son, ""I was as old as you are at the present at the time of your birth"". If the father's age is
58 years now, what was the son's age seven years back?"
Manoranjan could either walk or drive to office. The time taken to walk to the office is 9 times the driving time. One day, his wife took the car making him walk to office. After walking 3 km, he reached a temple when his wife called to say that he can now take the car. Ramanujam figured that continuing to walk to the office will take as long as walking back home and then driving to the office. Calculate the distance between the temple and the office in KMs.
Suppose the distance between his home and office is x km. Then, distance between his office and temple is (x – 3) km.
If he walks at a speed of y km/hr. Then his driving speed = 9y km/hour, as he is 9 times faster in car.
Then,
3/y + x/9y = (x – 3)/y
Or, 3 + x/9 = x – 3
or 8x/9 = 6
Or, x = 27/4
Finally, x – 3 = 27/4 - 3 = 15/4
Option 8)
Mean = Sum of nos. / Count of numbers = (23+16+45+28+18+23+36)/7 = 189/7 = 27
Median = Middle term when number are arranged in ascending order = 23
Mode = Number which is present maximum number of times =23
Product = 23*23*27 = 14283
P can do a work in 19.5 days. Q can do the same work in 13 days and R can do the same in 6.5 days. Q and R start the work and leave after 4 days. P finishes the remaining work in X days. What is the value of X?
OPtion
1) 2.5 days
2) 2.0 days
3) 1.75 days
4) 1.5 days
5) 2.25 days
6) 4.5 days
7) 5 days
8) 5.5 days
9) 6.0 days
10) None of these
Solution
Amount of work done by Q and R in 4 days = 4*(1/13 + 1/6.5) = 12/13
Amount of work remaining after 4 days = 1/13
Amount of work done by P in 1 day = 1/19.5
So for 1/19.5 work P takes 1 day
Hence for 1/13 work P would take (1/(1/19.5))*1/13 = 1.5 days